> ## Documentation Index
> Fetch the complete documentation index at: https://realsite.ca/docs/llms.txt
> Use this file to discover all available pages before exploring further.

# Listing plans

> Choose a listing and launch date, adjust a short plan, and prepare each piece in Marketing.

Open **Marketing → Overview → Plan a listing**, or choose **Listing plan** on an active
listing’s card to start with that property selected. Choose a launch date, then choose
**Create listing plan**. If that listing already has a plan, open it to continue.

## Four tasks to start with

| Task | Suggested date | What you prepare |
| - | - | - |
| Prepare a feature sheet | Day before launch | An editable property overview and PDF |
| Introduce the listing | Launch day | A property image and social caption |
| Share a Reel | Two days after launch | A property video using your listing photos |
| Highlight a favourite detail | Five days after launch | A photo and writing for Stories |

These are starting dates, not a required schedule. Use **Edit task** to change its
title or date. **Skip** leaves out a task; **Restore task** brings it back.

Changing the **Launch date** moves unfinished tasks by the same number of days,
including tasks you previously moved yourself. Done and skipped tasks keep their
dates. Dates use your site’s time zone, as shown beside the launch-date controls.

## Prepare a piece, then use it

Choose **Prepare design** to open a saved project with this listing’s details
and your current website collection. The launch post and highlight start with one
photo; you can change the photo, writing, layout and colours in the social editor.
Each task keeps a separate design. Editing a later Story does not overwrite the
launch post. Reopening a task opens its existing project.

Preparing a task creates a draft. Use the editor’s export controls when you want
the finished files. The social editor can also export the other social formats.
[Read the social editing guide](/docs/help/marketing-studio) or
[the print and PDF guide](/docs/help/print-marketing).

Use **Back to listing plan** to return. After sharing a piece or completing its
preparation, choose **Mark done**. **Undo done** reopens it. Downloading a file
does not complete a task or mean a post was published.

<Note>
  The planner does not publish to social accounts or send email reminders. Download
  your materials and review and share them in your social app yourself. Your next
  tasks appear on **Home** and in **Marketing**.
</Note>

## When a listing changes

Price, address, city or status changes ask you to review the plan. Check the
changes and choose **I’ve reviewed these changes**. Saved materials have their
own listing-update review in the editor; reviewing the plan does not rewrite them.

A sold listing, an unavailable listing or an incomplete manual draft pauses
preparation. Finish an incomplete listing through **Review listing**, save it,
then use **Continue to listing plan**. Dates and history stay saved while paused.
Your saved projects remain in Marketing; access to listing-based materials
still depends on that listing being available to your site.

**Remove plan** removes its dates and task history. It keeps the saved marketing
projects, which you can continue using from Marketing.

The **Your marketing timeline** section in a seller presentation is separate:
it explains your approach to a prospective seller. Editing it does not change a
listing plan or schedule any work.


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.